Case Study: Utilization of Guppy® Water Filled Flood Control Tubes at Roadway Construction Project


PROJECT OVERVIEW:

GeoStabilization International®, founded in 2002, is the leading geohazard mitigation firm operating throughout the United States, Canada, and New Zealand. GeoStabilization specializes in emergency slope stabilization and landslide repair, rockfall mitigation, grouting, and micropiles using design/build contracting.

In a recent emergency roadway construction project aimed at repairing and upgrading a state highway, the use of Guppy™ Water Filled Flood Control Tubes played a pivotal role in ensuring the successful and timely completion of the project. The project's primary challenge involved diverting a stream of water to facilitate safe and uninterrupted construction activities alongside a hazardous roadside.

Source: Geostabilization International®

SOLUTION AND IMPLEMENTATION:

To address this critical challenge, GeoStabilization International® contacted Garrison Flood Control to speak with a technical flood expert about which type of flood mitigating product would be most effective at re-routing flood water away from the job site. Due to the uneven ground conditions a flexible flood control product was needed that could conform to the undulating ground below.

After careful consideration and reviewing their specific needs for the project with the Garrison Flood Control Technical Team, Project Manager, Joe Henthorn, at GeoStabilization International® placed an order for three 24-inch by 100-foot Guppy Water Filled Flood Control Tubes. These tubes were strategically deployed to redirect the water flow, thus creating a dry and safe workspace for the construction crew to complete the job. This enabled the workers to perform various tasks alongside the highway without the interference of water, significantly enhancing efficiency and safety.

 
When unanticipated geohazards threaten critical sources, our ability to rapidly respond with effective solutions is paramount.
— Joe Henthorn, Project Manager at GeoStabilization International
 

The inclusion of this quote adds a personal and expert perspective to the case study, highlighting the industry's commitment to finding innovative solutions for geotechnical challenges.

IMPACTS AND BENEFITS:

The deployment of the Guppy Water Filled Flood Control Tubes had several key benefits for the remediation of this project:

  • Enhanced Safety:

    • By effectively diverting the water stream away from the job site, the tubes ensured a safer working environment for the construction team, mitigating the risk of accidents associated with water-related hazards. The diversion of water away from the roadway embankment allowed work to be done without risk of collapse of the embankment due to water infiltration

  • Operational Efficiency:

    • The dry and stable working area allowed the crew to perform their tasks more efficiently and expedite the roadway repair process. The creation of a water-free work area facilitated seamless and rapid progress in the repair operations, illustrating the practical utility of the flood control tubes.

  • Timely Project Completion:

    • Thanks to quick setup of the Guppy Flood Tubes and the expedited shipping facilitated by Garrison, the tubes were promptly delivered and installed, ensuring no delays in the project timeline.

  • Environmental Consideration:

    • The use of water-filled tubes as a temporary solution minimized the environmental and ecological impact, aligning with GeoStabilization International®'s commitment to eco-friendly practices and sustainability.


 

Garrison's Guppy Water Filled Flood Tubes

Guppy™ is an economical, yet effective, flood barrier solution that protects your assets against flooding. Whether it’s for homes, municipal buildings, construction sites, commercial facilities or other valuable infrastructure, the Guppy™ flood water diverter is there to provide Garrison level protection.

 
 

Tube Fills With Water

Guppy™ fills with water using a standard garden hose.

6“, 12” & 24” Heights

Choose the protection height that best meets your flood needs.

4 Available Lengths

Guppy™ flood diversion dams are available in 10’, 25’, 50’ and 100’ lengths.

Durable Flood Protection

Each Guppy tube has incredible tear and tension strength.

Stores Compactly & Reusable

Guppy flood tubes are reusable and roll compactly for simple storage.

 

CONCLUSION:

The successful application of Garrison’s Guppy Water Filled Flood Diversion Tubes in this roadway construction project underscores the value of innovative, flexible solutions in addressing complex geohazard challenges. GeoStabilization International®'s strategic approach and effective execution not only facilitated the timely repair of the affected roadway but also reinforced the company's reputation as a leader in geohazard mitigation.

Guppy™ Water Filled Flood Tubes are available in 6”, 12” and 24” diameters as well as 10ft, 25ft, 50ft and 100ft lengths, providing flexible large-scale flood protection for any type of flood event or scenario.

The ecological footprint of the project was minimized through the use of the Guppy Flood Tubes as a temporary and environmentally considerate water management solution, reflecting GeoStabilization International®'s commitment to sustainability.


For more information on the Guppy Flood Tubes, feel free to contact us directly!

Watch The Case Study Video Below to Learn How Guppy Water Filled Flood Tubes Divert and Reroute Water Away From Construction Sites

 
 

Garrison™ Flood Control is a New York-based manufacturer and distributor of a complete line of flood control products. Garrison products contain, divert, and re-route water away from valuable property, equipment, infrastructure, and facilities and help prevent flood damage due to rising water levels.

For additional information about Garrison Flood Control Systems, please call 929-299-2099 or email sales@garrisonflood.com.

Previous
Previous

Garrison™ Systems Deploys Innovative Flood Protection Solutions Across Florida | Press Release

Next
Next

Case Study: Pepsi Bottling Company's Implementation of Mayim Interlocking Flood Barriers